Atascadero Unified School District

High School Master Plan

Atascadero, CA

PROJECT STATS

Client: Stu Stoddard, Facilities Director, Atascadero Unified School District

DESIGN & ENGINEERING TEAM

Ravatt Albrecht & Associates

REQUIRED REGULATIONS AND STANDARDS

  • Division of the State Architect (DSA)

PROJECT OBJECTIVE

To modernize and re-organize the existing High School Campus.

PROJECT DESCRIPTION

This past year, Ravatt Albrecht & Associates was asked to further develop the Master Plan due to new financing made available by the passage of local bond measures.  A major component of the Master Plan was to provide a public gathering space for the students that could also serve as a multipurpose outdoor space.  This request was solved with the development of a  circular plaza near the administration building. The Plan also provides locations on site for the proposed Career Technical Education building (CTE) and a future science classroom building. Upgrades to the pedestrian path throughout the campus all the way to the parking lot are planned as well as a new drop-off area to alleviate some of the vehicular congestion. The transformation of the campus will create a new, useable, more enjoyable space and will open the door for future modernization projects. 

Check out the article in the Tribune on the Master Plan!

RAVATT ALBRECHT & ASSOCIATES SERVICES

Architectural master planning, Site evaluations, Ciculation study, Parking study, Building massing study.